Auvent centre de tri
Réalisé en 2021
Client : VEOLIA
Lieu : SECLIN (59)
Tonnage : 220 T
Surface : 2800 m²
Caractéristiques du chantier :
Veolia Seclin: Construction of a 37m wide and 78m long galvanized canopy
Veolia commissioned us to construct a galvanized canopy in Seclin. The canopy is 37 meters wide and 78 meters long, with a height of 17 meters at its highest point.
The canopy's frame is made of trusses with a span of 30 meters and a height of 2.2 meters. The trusses were assembled in the workshop, which allowed for a smooth installation.
The project was completed on time and within budget.